Delivery of prefabricated modular constructions  

23 October 2020

In September 2020, Module-T delivered prefabricated modular buildings in several African countries such as Ghana, Nigeria and Cameroon. For Ghana and Nigeria, we shipped on one or two floor...

Read More
Prefabricated Buildings: standard and ecological construction

Prefabricated Buildings: standard and ecological construction

6 July 2020

The demand for housing and the urgency of the situations have led industrialists to invest in construction methods that are faster and much more economical than traditional concrete constructions....

Read More
Delivery of Prefabricated Building to Ghana

Delivery of Prefabricated Building to Ghana

8 May 2020

Last month, 600 square meters of prefabricated buildings were exported to Ghana by Module-T. The project, which was designed in accordance with the physical and geographical conditions of Ghana,...

Read More

Module-T Prefabricated Worksite Containers in the Caribbean

9 April 2019

55 Units prefabricated worksite containers were exported to Trinidad and Tobago, Dominican Republic and Grenada Island in the Caribbean Region by Module-t. Modular sandwich panel containers are specially designed...

Read More
× Support Whatsapp